Gas day Nov 27
-0.066
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
-0.063
Bcf/d
30-day average
-0.051
30 of 30 days posted
30-day high
-0.036
Nov 1
30-day low
-0.069
Nov 26
Operating capacity
0.069
Bcf/d as posted, timely cycle
Utilization
96%
headroom 4%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | -0.066 | +0.003 |
| Nov 26 | -0.069 | +0.000 |
| Nov 25 | -0.069 | -0.027 |
| Nov 24 | -0.042 | +0.027 |
| Nov 23 | -0.069 | +0.000 |
| Nov 22 | -0.069 | -0.010 |
| Nov 21 | -0.059 | +0.006 |
| Nov 20 | -0.064 | -0.004 |
| Nov 19 | -0.060 | +0.007 |
| Nov 18 | -0.067 | -0.017 |
| Nov 17 | -0.050 | -0.006 |
| Nov 16 | -0.044 | +0.010 |
| Nov 15 | -0.054 | -0.002 |
| Nov 14 | -0.051 | -0.010 |
| Nov 13 | -0.042 | +0.003 |
| Nov 12 | -0.045 | +0.003 |
| Nov 11 | -0.048 | -0.004 |
| Nov 10 | -0.044 | -0.003 |
| Nov 9 | -0.042 | -0.001 |
| Nov 8 | -0.041 | +0.001 |
| Nov 7 | -0.042 | +0.001 |
| Nov 6 | -0.043 | -0.001 |
| Nov 5 | -0.042 | +0.001 |
| Nov 4 | -0.043 | -0.001 |
| Nov 3 | -0.042 | -0.004 |
| Nov 2 | -0.038 | -0.001 |
| Nov 1 | -0.036 | +0.021 |
| Oct 31 | -0.058 | -0.019 |
| Oct 30 | -0.038 | +0.030 |
| Oct 29 | -0.069 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on ANR Pipeline (TC Energy)
- DUGAS RD REC 0.651 Bcf/d
- WEEKS ISLA/LIG PL -0.199 Bcf/d
- RIVERWAY (TO BRIDGELINE) -0.149 Bcf/d
- FORT ELLIOTT RECEIPT 0.095 Bcf/d
- BARNITZ CREEK 0.069 Bcf/d
- LIDDIEVILLE 42 0.054 Bcf/d
- SPEARMAN 0.020 Bcf/d
- AVALON -0.020 Bcf/d
Cite thisEnercast PipeScrape, OPELOUSAS (ANR Pipeline (TC Energy) loc 10111) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/10111/