RIVERWAY (TO BRIDGELINE)

ANR Pipeline (TC Energy) · Loc 42593 · Louisiana
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.125
Bcf/d scheduled
Δ Day-over-day
+0.020
vs Nov 25
7-day average
-0.137
Bcf/d
30-day average
-0.144
30 of 30 days posted
30-day high
-0.125
Nov 17
30-day low
-0.173
Nov 5
Operating capacity
0.178
Bcf/d as posted, timely cycle
Utilization
70%
headroom 30%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.125+0.020
Nov 25-0.145-0.010
Nov 24-0.135+0.020
Nov 23-0.155-0.005
Nov 22-0.150-0.025
Nov 21-0.126+0.000
Nov 20-0.126+0.000
Nov 19-0.126+0.000
Nov 18-0.126-0.001
Nov 17-0.125+0.001
Nov 16-0.126+0.028
Nov 15-0.154+0.001
Nov 14-0.154-0.000
Nov 13-0.154-0.018
Nov 12-0.136+0.001
Nov 11-0.138+0.017
Nov 10-0.155-0.005
Nov 9-0.150+0.004
Nov 8-0.154-0.004
Nov 7-0.150-0.005
Nov 6-0.145+0.028
Nov 5-0.173-0.028
Nov 4-0.146+0.002
Nov 3-0.148-0.002
Nov 2-0.146-0.005
Nov 1-0.141+0.012
Oct 31-0.153+0.001
Oct 30-0.154+0.000
Oct 29-0.154-0.012
Oct 28-0.142—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR Pipeline

ANR PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-09-25 · force majeure
ANR Pipeline has declared a Force Majeure at Patterson Compressor Station (Unit 1) in Jefferson Parish, Louisiana due to an unexpected equipment failure, effective September 25, 2026 through October 4, 2026. The outage reduces capacity across multiple interconnects including Shad…
ANR Pipeline (TC Energy) · posted 2026-09-15 · informational
ANR Pipeline (TC Energy) · posted 2026-09-02 · informational
Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, RIVERWAY (TO BRIDGELINE) (ANR Pipeline (TC Energy) loc 42593) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/42593/