ANR Pipeline (TC Energy) · Loc 233620 · Louisiana
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.192
Bcf/d scheduled
Δ Day-over-day
+0.007
vs Nov 25
7-day average
-0.158
Bcf/d
30-day average
-0.162
30 of 30 days posted
30-day high
-0.092
Nov 17
30-day low
-0.199
Nov 25
Operating capacity
0.209
Bcf/d as posted, timely cycle
Utilization
92%
headroom 8%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.192+0.007
Nov 25-0.199-0.037
Nov 24-0.162+0.004
Nov 23-0.166+0.000
Nov 22-0.166-0.056
Nov 21-0.110-0.002
Nov 20-0.108-0.012
Nov 19-0.096-0.003
Nov 18-0.093-0.002
Nov 17-0.092+0.014
Nov 16-0.106+0.087
Nov 15-0.192+0.000
Nov 14-0.193+0.006
Nov 13-0.199-0.040
Nov 12-0.158-0.002
Nov 11-0.156+0.022
Nov 10-0.178+0.019
Nov 9-0.197-0.007
Nov 8-0.190+0.007
Nov 7-0.197-0.024
Nov 6-0.173-0.003
Nov 5-0.170+0.009
Nov 4-0.179+0.009
Nov 3-0.188-0.011
Nov 2-0.177+0.015
Nov 1-0.192-0.035
Oct 31-0.157-0.007
Oct 30-0.150+0.003
Oct 29-0.152+0.008
Oct 28-0.160—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR Pipeline

ANR PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-09-25 · force majeure
ANR Pipeline has declared a Force Majeure at Patterson Compressor Station (Unit 1) in Jefferson Parish, Louisiana due to an unexpected equipment failure, effective September 25, 2026 through October 4, 2026. The outage reduces capacity across multiple interconnects including Shad…
ANR Pipeline (TC Energy) · posted 2026-09-15 · informational
ANR Pipeline (TC Energy) · posted 2026-09-02 · informational
Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WEEKS ISLA/LIG PL (ANR Pipeline (TC Energy) loc 233620) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/233620/