Gas day Nov 26
0.054
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.052
Bcf/d
30-day average
0.057
30 of 30 days posted
30-day high
0.108
Nov 2
30-day low
0.019
Nov 16
Operating capacity
0.750
Bcf/d as posted, timely cycle
Utilization
7%
headroom 93%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.054 | -0.002 |
| Nov 25 | 0.056 | +0.003 |
| Nov 24 | 0.053 | +0.002 |
| Nov 23 | 0.051 | +0.000 |
| Nov 22 | 0.051 | +0.000 |
| Nov 21 | 0.051 | +0.000 |
| Nov 20 | 0.051 | +0.000 |
| Nov 19 | 0.051 | +0.000 |
| Nov 18 | 0.051 | +0.001 |
| Nov 17 | 0.050 | +0.031 |
| Nov 16 | 0.019 | -0.052 |
| Nov 15 | 0.071 | +0.000 |
| Nov 14 | 0.071 | +0.028 |
| Nov 13 | 0.043 | +0.010 |
| Nov 12 | 0.033 | +0.000 |
| Nov 11 | 0.033 | -0.007 |
| Nov 10 | 0.040 | +0.000 |
| Nov 9 | 0.040 | +0.000 |
| Nov 8 | 0.040 | +0.000 |
| Nov 7 | 0.040 | -0.008 |
| Nov 6 | 0.048 | -0.007 |
| Nov 5 | 0.055 | +0.010 |
| Nov 4 | 0.045 | +0.005 |
| Nov 3 | 0.040 | -0.068 |
| Nov 2 | 0.108 | +0.000 |
| Nov 1 | 0.108 | +0.016 |
| Oct 31 | 0.092 | +0.000 |
| Oct 30 | 0.092 | +0.000 |
| Oct 29 | 0.092 | -0.004 |
| Oct 28 | 0.096 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on ANR Pipeline (TC Energy)
- DUGAS RD REC 0.623 Bcf/d
- WEEKS ISLA/LIG PL -0.192 Bcf/d
- RIVERWAY (TO BRIDGELINE) -0.125 Bcf/d
- FORT ELLIOTT RECEIPT 0.095 Bcf/d
- BARNITZ CREEK 0.069 Bcf/d
- OPELOUSAS -0.069 Bcf/d
- SPEARMAN 0.020 Bcf/d
- AVALON -0.020 Bcf/d
Cite thisEnercast PipeScrape, LIDDIEVILLE 42 (ANR Pipeline (TC Energy) loc 924935) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/924935/