Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DUGAS RD REC

ANR Pipeline (TC Energy) · Loc 513142 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.623
Bcf/d scheduled
Δ Day-over-day
+0.037
vs Nov 25
7-day average
0.653
Bcf/d
30-day average
0.635
30 of 30 days posted
30-day high
0.728
Nov 12
30-day low
0.554
Nov 1
Operating capacity
1.100
Bcf/d as posted, timely cycle
Utilization
57%
headroom 43%

Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.600.80Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.623+0.037
Nov 250.587-0.056
Nov 240.642-0.043
Nov 230.686+0.000
Nov 220.686+0.010
Nov 210.675+0.003
Nov 200.673+0.056
Nov 190.616-0.047
Nov 180.663-0.011
Nov 170.674+0.005
Nov 160.668-0.004
Nov 150.672+0.001
Nov 140.671-0.009
Nov 130.679-0.049
Nov 120.728+0.000
Nov 110.728+0.120
Nov 100.608+0.017
Nov 90.591+0.029
Nov 80.562-0.029
Nov 70.591-0.003
Nov 60.594+0.003
Nov 50.591-0.030
Nov 40.621+0.060
Nov 30.561+0.001
Nov 20.560+0.006
Nov 10.554-0.077
Oct 310.632+0.000
Oct 300.632+0.013
Oct 290.619-0.057
Oct 280.676—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
ANR Pipeline

ANR PipelineState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

ANR Pipeline (TC Energy) · posted 2026-10-22 · informational
ANR Pipeline (TC Energy) · posted 2026-09-23 · informational
Recent notices on ANR Pipeline (TC Energy)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →

ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DUGAS RD REC (ANR Pipeline (TC Energy) loc 513142) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/513142/