Rockies Express

[OPERATIONAL ALERT] BERTRAND COMPRESSOR STATION OPERATIONAL ISSUE - UPDATE #16

SEV 5/5
Compressor Issue 1.075 Bcf/d Until Further Notice

REX Bertrand Compressor Station operational issue (Update #16) restricts Segment 250 westbound-to-eastbound capacity to 1.075 Bcf/d effective Gas Day August 1, 2026, until further notice. Primary firm, secondary firm, and ITS/AOR service are all explicitly at risk of not being scheduled. No restoration timeline has been provided.

REX Segment 250 restricted to 1.075 Bcf/d with primary and secondary firm at risk; expect bullish pressure at Midcontinent and downstream Midwest basis points as eastbound Rockies takeaway is curtailed, with bearish pressure at CIG/Cheyenne Hub as Rockies gas backs up -- no restoration timeline adds upward severity bias.
Reroute: None: Trailblazer Pipeline leases capacity at Bertrand Compressor Station on REX -- when REX Segment 250 is constrained at Bertrand, Trailblazer is simultaneously affected and cannot serve as an independent reroute option. CIG provides some Rockies egress but cannot replace REX eastbound volumes at this scale.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [OPERATIONAL ALERT] THIRD PARTY OPERATIONAL ISSUE - BERTRAND COMPRESSOR STATION - UPDATE #16

SEV 4/5
Operational Alert 0.818 Bcf/d Until Further Notice

Trailblazer Pipeline Segment 20 is restricted to 0.818 Bcf/d effective Gas Day August 1, 2026, until further notice due to a third-party operational issue at Bertrand Compressor Station (Update #16). At this restricted level, primary firm, secondary firm, and interruptible service are all at risk of not being scheduled. No restoration timeline has been provided.

Trailblazer Segment 20 restricted to 0.818 Bcf/d with primary and secondary firm at risk; because Trailblazer leases capacity at Bertrand CS on REX, REX Zone 1 is simultaneously constrained -- reroute is effectively zero, expect bearish pressure at CIG/Cheyenne Hub as Rockies gas backs up with no viable takeaway alternative.
Reroute: None: Trailblazer and REX share Bertrand Compressor Station -- this is the same third-party facility constraining both pipes simultaneously, meaning REX cannot serve as an independent reroute for Trailblazer volumes. This is a correlated constraint with zero bypass for affected Rockies eastbound capacity.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the East Mainline segment, effective July 30, 2026 at 9:00 AM through July 31, 2026 at 8:59 AM. No specific capacity volume is stated in the notice. The East Mainline is the primary outbound corridor moving Permian Basin and San Juan Basin gas westward toward SoCal Border and Arizona delivery points.

TW East Mainline force majeure reduces westbound Permian/San Juan takeaway capacity; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- duration is 1 day but force majeure language warrants close monitoring for extension.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries, but any simultaneous EPNG constraint would eliminate California reroute options entirely. Verify EPNG East mainline availability before assuming full offset.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on its East Mainline segment, effective July 30, 2026 at 9:00 AM through July 31, 2026 at 8:59 AM -- a roughly 24-hour window. The East Mainline carries Permian Basin and San Juan Basin gas westbound toward SoCal border and Arizona delivery points. No specific capacity volume is stated in the notice.

TW force majeure on East Mainline reduces Permian/San Juan westbound takeaway capacity; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- monitor EPNG spare capacity as the only meaningful reroute alternative.
Reroute: Moderate: EPNG is the primary competing pipeline serving SoCal border and Arizona from the Permian/San Juan Basin corridor; however, if EPNG is simultaneously constrained or running near capacity in summer peak conditions, reroute may be limited.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure on the East Mainline, effective July 30, 2026 at 9:00 AM through July 31, 2026 at 8:59 AM. The East Mainline is the primary eastward segment carrying Permian/San Juan Basin gas westbound toward SoCal Border and Arizona delivery points. No specific capacity volume was stated in the notice.

TW East Mainline force majeure tightens westbound Permian/San Juan takeaway; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- monitor EPNG for any offsetting capacity given TW is constrained.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries, but if EPNG is simultaneously constrained or fully subscribed, reroute potential drops to none for California and Southwest markets.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a force majeure capacity constraint on its East Mainline, effective July 29, 2026 at 9:00 AM through July 30, 2026 at 8:59 AM -- a roughly 24-hour event. No specific capacity volume is stated in the notice. The East Mainline is the primary outbound segment carrying Permian Basin and San Juan Basin gas westward toward SoCal Border and Arizona delivery points.

TW East Mainline force majeure tightens westbound Permian/San Juan takeaway for ~24 hours; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- volume impact unquantified but force majeure on TW East Mainline warrants immediate attention given California supply sensitivity.
Reroute: Moderate: EPNG (El Paso Natural Gas) is the primary competing pipeline serving SoCal Border and Arizona markets and may absorb some displaced volumes, but if EPNG is also constrained or near capacity during summer cooling demand, reroute options are limited.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline declared force majeure on its East Mainline segment effective July 29, 2026 at 9:00 AM through July 30, 2026 at 8:59 AM -- a roughly 24-hour event. The East Mainline is a primary westbound outbound corridor moving Permian Basin and San Juan Basin gas toward SoCal Border and Arizona delivery points. No specific capacity volume was stated in the notice.

TW East Mainline force majeure reduces westbound Permian/San Juan takeaway capacity; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points for the duration of the 1-day event.
Reroute: Moderate: EPNG (El Paso Natural Gas) is the primary competing pipeline serving SoCal Border and Arizona markets from the Permian Basin, but spare EPNG capacity during a force majeure event may be limited and cannot guarantee full offset of constrained TW volumes.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure on its East Mainline, effective July 30, 2026 at 9:00 AM through July 31, 2026 at 8:59 AM. The East Mainline is a primary outbound corridor moving Permian Basin and San Juan Basin gas westward toward SoCal Border and Arizona delivery points. No specific volume restriction was stated in the notice.

TW East Mainline force majeure tightens Permian westbound takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points for the July 30 gas day.
Reroute: Moderate: EPNG is the primary competing pipeline for SoCal border and Arizona deliveries and may absorb some displaced TW volumes, but EPNG spare capacity during summer peak demand periods may be limited, constraining full offset.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared a Force Majeure on the East Mainline segment, effective July 29, 2026 at 9:00 AM through July 30, 2026 at 8:59 AM. The East Mainline is the primary outbound corridor carrying Permian Basin and San Juan Basin gas westward toward SoCal Border and Arizona delivery points. No specific capacity volume was stated in the notice.

TW East Mainline force majeure tightens westbound Permian/San Juan takeaway; expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points with no capacity volume disclosed to size the move.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline for SoCal Border and Arizona deliveries and may absorb some displaced volumes, but EPNG spare capacity is uncertain and a simultaneous EPNG constraint would eliminate California reroute entirely.
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Lincoln Station

SEV 4/5
Force Majeure 1 Days

EPNG has declared a force majeure at Lincoln Station effective 07/29/2026 at 8:31 AM, with an anticipated end date of 07/30/2026 at 9:00 AM. Lincoln Station is a compressor station on the EPNG mainline in New Mexico, a key node on the Permian-to-California corridor. No specific capacity volume is stated in the notice. Duration is approximately one day.

EPNG force majeure at Lincoln Station tightens westbound Permian takeaway for roughly 24 hours -- expect bearish pressure at Waha as basin gas backs up and bullish pressure at SoCal Border and Arizona delivery points with no volume quantified yet.
Reroute: Moderate: Transwestern Pipeline (TW) is the primary competing pipeline for SoCal border deliveries and may absorb some displaced volumes, though TW spare capacity varies and cannot be assumed sufficient to fully offset an EPNG mainline compressor FM event.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Capacity Constraint] EAST MAINLINE

SEV 4/5
Force Majeure 1 Days

Transwestern Pipeline has declared force majeure on its East Mainline, effective July 29, 2026 at 9:00 AM through July 30, 2026 at 8:59 AM -- approximately one day. The East Mainline is the primary outbound corridor carrying Permian Basin and San Juan Basin gas westward toward SoCal Border and Arizona delivery points. No specific capacity volume was stated in the notice.

Transwestern East Mainline force majeure reduces westbound takeaway from Permian/San Juan Basin for ~1 day; expect bearish pressure at Waha as basin gas backs up, with bullish pressure at SoCal Border and Arizona delivery points -- EPNG is the primary reroute alternative but may face capacity limitations if volumes are large.
Reroute: Moderate: El Paso Natural Gas (EPNG) is the primary competing pipeline serving SoCal Border and Arizona from the Permian Basin corridor; however, if the TW constraint is significant in volume, EPNG spare capacity may be insufficient to fully absorb displaced flows, and simultaneous EPNG + TW constraints would leave California with no viable reroute.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

07/29/2026- TE Pipeline Conditions for 7/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

EMERGENT REPAIR AT STA 264 EFF 7-31-26

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transwestern Pipeline

[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

CAPACITY POSTING - TIM for August 1, 2026 through August 3, 2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Eastern Transmission (TETCO)

07/30/2026- TE Pipeline Conditions for 7/31/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Algonquin Gas Transmission

07/30/2026- AGT Pipeline Conditions for 07/31/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

UPDATED: CAPACITY REDUCTION Southeast Mainline – Defiance Westbound

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

07/30/2026- NEXUS Pipeline Conditions for 07/31/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

07/30/2026- ETNG Pipeline Conditions for 07/31/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Transco

Tryon Lateral Unplanned Immediate Digs 2026 Planned Outage and Maintenance Summary

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

UPDATED: CAPACITY REDUCTION Southwest Area

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Florida Gas Transmission

[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
NEXUS Gas Transmission (U.S.)

07/29/2026- NEXUS Pipeline Conditions for 7/30/2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
East Tennessee Natural Gas

07/29/2026- ETNG Pipeline Conditions for 7/30/2026

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

Alexandria Station Maintenance (AlexSEG), August 5-6, 2026

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Florida Gas Transmission

[Florida Gas Transmission] [Operational Alert] Overage Alert Day 25% Tolerance

SEV 3/5
Informational

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 1715 Lebanon Ohio and Location 1720 Lebanon Dayton

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Westlake Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Carthage #2 Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Hall Summit Legacy Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Update: Paris Compressor Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Pipeline Maintainence-Oaktown

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Posted Maintenance Events for 07/31/2026 - 08/06/2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

TGP Outage Impact Report

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Maintenance - Location 9244 Rex-Franklin Receipt

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Failure to take confirmed quantities - Loc 9311 Westlake: Lake Charles Power Pla

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Texas Gas Transmission

Lake Cormorant Area Maintenance Impacting Location 1123 and Location 1631

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Trunkline Gas Company

[Trunkline Gas Company] [Maintenance] TGC Kaplan Station Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MONTHLY STORAGE TRANSFERS REMINDER

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Northern Border Pipeline (NBPL)

Construction and Maintenance Schedule - Updated July 30, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
ANR Pipeline (TC Energy)

MAINTENANCE SCHEDULE for ANR Pipeline

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Meter Maintenance - Third Party Pipeline Notice

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Gulf South Pipeline

Meter Maintenance - Third Party Pipeline Notice

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

CAPACITY POSTING - TIM for July 31, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MONTHLY STORAGE TRANSFERS REMINDER

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gas Transmission (TCO)

Construction and Maintenance Schedule Posting

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tallgrass Energy

[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR AUGUST 2026 - UPDATE #1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Rockies Express

[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR AUGUST 2026 - UPDATE #1

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Tennessee Gas Pipeline (TGP)

MONTHLY STORAGE TRANSFER REMINDER

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

CAPACITY POSTING - TIM for July 30, 2026

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] SEG 26-GC#3 ML-ILI TOOL RUNS-POSTPONE

SEV 1/5
Informational

Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.

Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[OPERATIONAL ALERT] SEG 18 - THOMPSONVILLE LAT - PIPE INTEG

SEV 1/5
Informational

Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.

Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE-M&M LAT MLV2 TO MLV3-PT

SEV 1/5
Informational

Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.

Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[MAINTENANCE] OUTAGE IMPACT REPORT 7-30-26

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Lincoln Station

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Bluewater Station

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
Algonquin Gas Transmission

07/29/2026- AGT Pipeline Conditions for 07/30/2026

UNSCORED
Informational
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

CAPACITY POSTING - TIM for August 1, 2026 through August 3, 2026

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure – Bondad Station – Unit #2

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure Lifted - Bondad Station

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
Natural Gas Pipeline (NGPL)

[FORCE MAJEURE] FORCE MAJEURE-M&M LATERAL-SEG3-LIFTED

UNSCORED
lifted ✓ Informational
View original notice text
Loading…
Transco

2026 Major Construction and Maintenance Projects

SEV 1/5
Informational

Transco has posted an updated 2026 major construction and maintenance schedule, superseding prior notice 17089661. The notice is a general informational posting referencing an external link to the full schedule; no specific outage dates, segments, or capacity restrictions are identified in the notice text itself. Any individual maintenance activities expected to affect transportation services will be communicated via separate notices prior to commencement.

No actionable trading signal from this notice -- it is a schedule update pointer with no capacity volumes, affected segments, or curtailment language; monitor 1Line portal for project-specific follow-on notices that may carry basis implications for Transco Zone 4, Zone 5, or Zone 6.
Reroute: Not applicable -- no specific constraint identified in this notice. Reroute assessments will be relevant when individual project notices are posted with segment and capacity details.
View original notice text
Loading…
Columbia Gulf Transmission (CGT)

CAPACITY POSTING - TIM for July 31, 2026

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure - Lincoln Station

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[FORCE MAJEURE] Force Majeure – Bluewater Station

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated July 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
El Paso Natural Gas (EPNG)

[MAINTENANCE] Updated Prelim August 2026 Maintenance

UNSCORED
Informational
View original notice text
Loading…
Columbia Gas Transmission (TCO)

CAPACITY POSTING - TIM for July 30, 2026

UNSCORED
Informational
View original notice text
Loading…
October 2026
504 notices
September 2026
782 notices
August 2026
2,480 notices
July 2026
703 notices
June 2026
586 notices
May 2026
506 notices
April 2026
722 notices
March 2026
467 notices