March 2026, by week · month overview
All
Force Majeure
Maintenance
Capacity
Compressor
Sev 4–5 Only
Energy Transfer
[Gulf Run Transmission] [Force Maj] CGT GR FMJ
SEV 4/5
Force Majeure
Until Further Notice
Gulf Run Transmission has declared a Force Majeure at the CGT GR Meter Station (#13548) in Richland Parish, Louisiana (Zone 1), effective January 28, 2026. Nominations at this interconnect have been reduced to EPSQ (Equivalent Prior Scheduling Quantity) with no restoration timeline provided. The event is open-ended ('until further notice') and affects a key interconnect between Gulf Run and Columbia Gulf Transmission, a primary Haynesville-to-Gulf Coast backhaul route.
Gulf Run force majeure on the CGT GR interconnect removes an indeterminate volume of Haynesville supply from the Columbia Gulf Transmission corridor with no restoration timeline; expect modest bullish pressure at Henry Hub and Transco Zone 4 until flow restoration is confirmed.
Reroute: Moderate: Gulf South Pipeline and Kinder Morgan assets serve overlapping Haynesville Basin corridors and may absorb some displaced volumes, but the specific CGT interconnect serves a unique routing path and full reroute is uncertain without knowing the affected volume.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Force Maj] CGT GR FMJ Update
SEV 4/5
Force Majeure
0.200 Bcf/d
Until Further Notice
62 Days
Gulf Run Transmission declared force majeure at the CGT GR meter station (#13548) in Richland Parish, Louisiana (Zone 1), effective January 29, 2026. Nominations at this interconnect are restricted to 200,000 MMBtu/day (0.200 Bcf/d), superseding the prior total shutdown under Notice #60993. The restriction runs through April 1, 2026, approximately 62 days, though the pipeline retains 'until further notice' language for updates.
Gulf Run FM at CGT GR limits Zone 1 throughput to 0.200 Bcf/d, curtailing Haynesville-origin gas moving toward Columbia Gulf Transmission and downstream Southeast/LNG markets; expect bearish Henry Hub and Haynesville basis pressure as supply backs up, with modest bullish signal at Transco Zone 4 and CGT downstream delivery points.
Reroute: Moderate: Gulf South and Kinder Morgan assets serve overlapping Haynesville corridors and could absorb some diverted volumes, but CGT GR is a key interconnect for moving Gulf Run Zone 1 gas into the Columbia Gulf northbound system; full offset is unlikely given the scale of the restriction.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Force Maj] CGT GR FMJ Update #2
SEV 4/5
Force Majeure
0.520 Bcf/d
Until Further Notice
Gulf Run Transmission declared force majeure at its CGT GR meter station (#13548) in Richland Parish, Louisiana (Zone 1), initially cutting nominations to zero, then to 200,000 MMBtu/d, and as of January 29 partially restoring to a cap of 520,000 MMBtu/d effective January 30. The end date is listed as April 1, 2026, but the notice states it remains in effect until further notice. This interconnect is a key Haynesville production outlet into Columbia Gulf Transmission, and the restriction limits approximately 0.52 Bcf/d of northbound Gulf Coast flow capacity.
Gulf Run FM caps CGT GR nominations at 0.52 Bcf/d with no firm restoration timeline, tightening Haynesville takeaway and supporting Henry Hub and Transco Zone 4 basis as supply that would otherwise flow north via CGT is constrained.
Reroute: Moderate: Gulf South and other Kinder Morgan Haynesville-area assets serve overlapping corridors, but Gulf Run is a dedicated high-capacity Haynesville egress pipe and partial reroute may not fully absorb the constrained volumes at CGT GR.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Force Maj] East Line FMJ
SEV 4/5
Force Majeure
Until Further Notice
Enable Mississippi River Transmission has declared force majeure on its East Line due to unplanned maintenance at STL Chain of Rocks (MP 100007) in St. Louis County, Missouri, effective January 21, 2026, with no restoration timeline given. Nominations at the STL Chain of Rocks delivery/receipt point will not be scheduled for the duration. MRT acknowledges firm service impacts are anticipated based on current nominations.
MRT force majeure on East Line removes a key Arkansas/Missouri delivery point with no restoration timeline and confirmed firm service impacts; expect tightening of MRT-served local distribution markets in AR/MO with limited reroute alternatives.
Reroute: Limited: MRT serves specific local markets in Arkansas and Missouri with few pipeline alternatives; ANR and Gulf South provide some overlapping supply paths but cannot fully replace MRT East Line deliveries into St. Louis County-area points.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID2
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Oper Alert] Cold Weather Action Alert
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [OFO] Cold Weather OFO
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Warm Weather SPW
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Northbound High Utilization SPW
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Northbound High Utilization SPW
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Warm Weather SPW
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] IBS/LPS/SRO - RESTRICTIONS
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL ALERT] SEG 27 - GC#2 LINE(GC305/306) PIPE INTEG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] SEGS 33/36 - AT OPERATING CAPACITY
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] SEG 24 - CS 346 - AT CAPACITY
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OPERATIONAL FLOW ORDER] OPERATIONAL FLOW ORDER - REPORT
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[STORAGE] ANT STAGECOACH INJECTION RESTRICTION3-12
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] Updated March 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] Updated March 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[TSP CAPACITY OFFERING] AVAILABLE FIRM CAPACITY - OS #1429
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 TIMELY CYCLE
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] RESTRICTIONS FOR 10-26-2026 ID2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-11-2026 EC
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] RESTRICTIONS FOR 03-10-2026 ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OVER-UNDER PERFORMANCE] Location Performance Update
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OVER-UNDER PERFORMANCE] Location Performance Update
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Evening
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID3
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Force Maj] Cold Weather OFO TERMINATED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Oper Alert] Cold Weather Action Alert Termination
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Northbound High Utilization SPW TERMINATED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Warm Weather SPW Termination
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Northbound High Utilization SPW TERMINATED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Force Maj] East Line FMJ TERMINATED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] Northbound High Utilization SPW TERMINATED
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] PRELIMINARY CHEYENNE CONNECTOR 20256 MAINTENANCE SCHEDULE UPDATED DECEMBER 2025
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] PRELIMINARY CHEYENNE CONNECTOR 20256 MAINTENANCE SCHEDULE UPDATED FEBRUARY 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] PRELIMINARY RUBY 2026 MAINTENANCE SCHEDULED UPDATED DECEMBER 2025
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] PRELIMINARY RUBY 2026 MAINTENANCE SCHEDULED UPDATED JANUARY 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] PRELIMINARY RUBY 2026 MAINTENANCE SCHEDULED UPDATED FEBRUARY 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] PHMSA MEGA RULE - CS 156 TO CS 158
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] SEG 8 - UNIT MAINTENANCE - CS 168
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] SEG 11-AM#3 M/L(CS 105/106)ILI TOOL-UPD1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OVER-UNDER PERFORMANCE] Location Performance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS ID1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] Updated March 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[OVER-UNDER PERFORMANCE] Location Performance Update
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[CAPACITY CONSTRAINT] EPNG OPEN FOR CONFIRMATIONS Timely
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] Updated March 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Westdale Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Golden Pass Pipeline Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Force Majeure] Force Majeure - Compressor Station P3 - 2/22/2026 (Intraday 3) through 3/15/2026. Revision 4
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 3/13/26 (Intraday 2 & 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 3/13/26 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Tallgrass Energy
[Tallgrass Interstate Gas Transmission (TIGT)] [WEATHER ALERT] WEATHER ALERT
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 3/12/26 (Intraday 1, 2, & 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Over-Under Performance] Critical Notice Underperformance - Multiple Points - Gas Day 3/12/26 (Intraday 3)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [TSP Cap Offer] Panola Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
El Paso (EPNG)
[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[TSP CAPACITY OFFERING] FIRM CAPACITY - EXPANSION OS# 1428
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[TSP CAPACITY OFFERING] REQUEST FOR PROPOSAL
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Sea Robin Pipeline] [Oper Alert] Sea Robin West Condensate Removal Facility
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Sea Robin Pipeline] [Oper Alert] Sea Robin West Leak Investigation Update #1
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Stingray Pipeline] [Maint] Stingray Planned Maintenance Update #2
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Stingray Pipeline] [Maint] Stingray Planned Maintenance Update #3
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/11/2025
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Plnd Outage] Planned Alto Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/12/25
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/15/2025
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/16/2025
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/19/2025
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance (12/26/25)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 12/30/2025
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] UPR Notice: 12/31/25
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/2/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/5/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/6/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/7/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/8/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/9/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/12/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/13/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/14/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/15/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/21/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/22/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/23/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] 1/24/26 UPR
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Force Maj] Panola FMJ
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/25/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Force Maj] Panola FMJ TERMINATED
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/26/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/27/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/28/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 1/31/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/1/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Alto Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Panola Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Vernon Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/10/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/11/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/12/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] EGT Delhi Planned Maintenance
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Panola Planned Maintenance Update
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Alto Planned Maintenance Update
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] Vernon Planned Maintenance Update
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance (2/19/26)
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance - 2/21/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/22/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2.23.26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/24/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Maint] EGT Delhi Planned Maintenance Update
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/26/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/27/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 2/28/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/1/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/2/26
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/3/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/5/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/6/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Gulf Run Transmission] [Ovr-Undr Perf] Underperformance 3/10/2026
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Oper Alert] MRT Storage SPW
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Enable Mississippi River Transmission] [Maint] Alton Loop East Integrity Digs
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Rover Pipeline] [Oper Alert] Weather Alert Lifted
UNSCORED
lifted ✓
Informational
View original notice text Loading…
Energy Transfer
[Rover Pipeline] [Other] Nominations to Vector on Rover
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Rover Pipeline] [Oper Alert] Rover Weather Alert
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Rover Pipeline] [Oper Alert] Weather Alert Lifted
UNSCORED
lifted ✓
Informational
View original notice text Loading…
Energy Transfer
[Trunkline Gas Company] [Maint] Trunkline South Texas Maintenance Update #1
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Force Majeure] Force Majeure - Compressor Station P3 - 2/22/2026 (Intraday 3) through 3/13/2026. Revision 3
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR JANUARY 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] PRELIMINARY CHEYENNE CONNECTOR 20256 MAINTENANCE SCHEDULE UPDATED JANUARY 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR FEBRUARY 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Cheyenne Connector] [MAINTENANCE] CHEYENNE CONNECTOR MAINTENANCE SCHEDULE FOR MARCH 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] RUBY MAINTENANCE SCHEDULE FOR JANUARY 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] RUBY MAINTENANCE SCHEDULE FOR FEBRUARY 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Ruby Pipeline] [MAINTENANCE] RUBY MAINTENANCE SCHEDULE FOR MARCH 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[MAINTENANCE] STATION MAINTENANCE - CS 348 - COMPLETED
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso (EPNG)
[PIPELINE CONDITIONS] CURRENT PIPELINE CONDITIONS
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Energy Transfer
[Transwestern Pipeline] [Capacity Constraint] P-3 COMP.STA.
UNSCORED
Informational
View original notice text Loading…
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR MARCH 2026 - UPDATE #2
UNSCORED
Informational
View original notice text Loading…