Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

WEYEHAEUSER (OSTRANDER PLANT)

Northwest Pipeline · Loc 216545 · COWLITZ, Washington
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.022
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 25
7-day average
0.020
Bcf/d
30-day average
0.017
30 of 30 days posted
30-day high
0.026
Nov 19
30-day low
0.003
Nov 5
Operating capacity
0.029
Bcf/d as posted, evening cycle
Utilization
74%
headroom 26%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.022+0.005
Nov 250.017-0.002
Nov 240.018-0.001
Nov 230.019+0.000
Nov 220.019+0.000
Nov 210.019-0.006
Nov 200.025-0.001
Nov 190.026+0.002
Nov 180.025+0.003
Nov 170.022+0.001
Nov 160.021+0.000
Nov 150.021+0.002
Nov 140.019+0.003
Nov 130.015-0.004
Nov 120.019+0.002
Nov 110.018+0.006
Nov 100.011-0.001
Nov 90.012+0.004
Nov 80.008+0.000
Nov 70.008+0.002
Nov 60.006+0.003
Nov 50.003-0.004
Nov 40.007-0.004
Nov 30.011-0.004
Nov 20.016+0.000
Nov 10.016-0.005
Oct 310.021+0.000
Oct 300.021+0.001
Oct 290.020+0.003
Oct 280.017—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineWEYEHAEUSER (OSTRANDER PLANT)

Northwest PipelinePlaced at the center of Cowlitz, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WEYEHAEUSER (OSTRANDER PLANT) (Northwest Pipeline loc 216545) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/216545/