RIVERGATE (OREGON STEEL)

Northwest Pipeline · Loc 216453 · MULTNOMAH, Oregon
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.007
Oct 31
30-day low
0.004
Nov 3
Operating capacity
0.011
Bcf/d as posted, evening cycle
Utilization
37%
headroom 63%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.0060.008Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.004+0.000
Nov 250.004+0.000
Nov 240.004+0.000
Nov 230.004+0.000
Nov 220.004+0.000
Nov 210.004+0.000
Nov 200.004+0.000
Nov 190.004+0.000
Nov 180.004-0.001
Nov 170.005+0.000
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005+0.000
Nov 130.005+0.000
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005+0.000
Nov 90.005+0.000
Nov 80.005+0.000
Nov 70.005+0.000
Nov 60.005+0.000
Nov 50.005+0.000
Nov 40.005+0.001
Nov 30.004-0.001
Nov 20.005+0.000
Nov 10.005-0.002
Oct 310.007+0.000
Oct 300.007+0.000
Oct 290.007+0.002
Oct 280.005—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineRIVERGATE (OREGON STEEL)

Northwest PipelinePlaced at the center of Multnomah, OR — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, RIVERGATE (OREGON STEEL) (Northwest Pipeline loc 216453) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/216453/