BOEING-FREDRICKSON

Northwest Pipeline · Loc 164366 · Pierce, Washington
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.002
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 9
30-day low
0.000
Nov 19
Operating capacity
0.004
Bcf/d as posted, evening cycle
Utilization
48%
headroom 52%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0010.0020.003Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002+0.001
Nov 250.001-0.001
Nov 240.002+0.000
Nov 230.002-0.000
Nov 220.002+0.000
Nov 210.002+0.001
Nov 200.001+0.001
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000-0.000
Nov 140.000-0.000
Nov 130.001-0.000
Nov 120.001+0.000
Nov 110.001-0.001
Nov 100.002-0.000
Nov 90.002+0.000
Nov 80.002-0.000
Nov 70.002+0.001
Nov 60.001+0.000
Nov 50.001+0.001
Nov 40.001-0.000
Nov 30.001-0.001
Nov 20.002+0.000
Nov 10.001+0.001
Oct 310.001+0.000
Oct 300.001-0.000
Oct 290.001—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineBOEING-FREDRICKSON

Northwest PipelinePlaced at the center of Pierce, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BOEING-FREDRICKSON (Northwest Pipeline loc 164366) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/164366/