Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

SOUTH LONGVIEW FIBRE

Northwest Pipeline · Loc 216427 · COWLITZ, Washington
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.035
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.040
Bcf/d
30-day average
0.039
30 of 30 days posted
30-day high
0.050
Nov 5
30-day low
0.003
Oct 28
Operating capacity
0.063
Bcf/d as posted, evening cycle
Utilization
56%
headroom 44%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.035-0.002
Nov 250.037-0.004
Nov 240.041+0.004
Nov 230.037-0.004
Nov 220.042-0.006
Nov 210.047+0.008
Nov 200.040-0.001
Nov 190.041+0.003
Nov 180.037+0.002
Nov 170.036-0.010
Nov 160.045+0.000
Nov 150.045+0.004
Nov 140.041+0.001
Nov 130.040-0.007
Nov 120.047+0.000
Nov 110.047+0.003
Nov 100.044-0.006
Nov 90.050+0.001
Nov 80.049+0.001
Nov 70.049+0.010
Nov 60.038-0.012
Nov 50.050+0.004
Nov 40.046+0.004
Nov 30.042+0.002
Nov 20.040-0.001
Nov 10.040+0.005
Oct 310.035+0.011
Oct 300.024+0.019
Oct 290.006+0.003
Oct 280.003—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineSOUTH LONGVIEW FIBRE

Northwest PipelinePlaced at the center of Cowlitz, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SOUTH LONGVIEW FIBRE (Northwest Pipeline loc 216427) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/northwest/216427/