Gas day Nov 26
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.001
Nov 26
30-day low
0.000
Nov 13
Operating capacity
0.001
Bcf/d as posted, eve cycle
Utilization
95%
headroom 5%
Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.001 | +0.000 |
| Nov 25 | 0.001 | +0.000 |
| Nov 24 | 0.001 | +0.000 |
| Nov 23 | 0.001 | +0.000 |
| Nov 22 | 0.001 | +0.000 |
| Nov 21 | 0.001 | +0.000 |
| Nov 20 | 0.001 | +0.000 |
| Nov 19 | 0.001 | +0.000 |
| Nov 18 | 0.001 | +0.000 |
| Nov 17 | 0.001 | +0.000 |
| Nov 16 | 0.001 | +0.000 |
| Nov 15 | 0.001 | +0.000 |
| Nov 14 | 0.001 | +0.001 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | -0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | -0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | +0.000 |
| Oct 28 | 0.000 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf South PipelinePlaced at the center of Calcasieu, LA — approximate; the exact meter site is not published.
Notices
Recent notices on Gulf South Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →
Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on Gulf South Pipeline
- Methanex Geismer 2 0.185 Bcf/d
- Pascagoula High Pressure (To Chevron) 0.071 Bcf/d
- Valero St Charles Aggregate 0.068 Bcf/d
- Praxair Hydrogen St. Charles/Valero 0.061 Bcf/d
- Air Products Hydrogen @ Garyville 0.059 Bcf/d
- Nucor Steel Mill 0.050 Bcf/d
- Air Products - Norco 0.049 Bcf/d
- Westlake: Lake Charles South Plant 0.037 Bcf/d
Cite thisEnercast PipeScrape, Chemtura - Lake Charles (Gulf South Pipeline loc 6355) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/6355/