Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Air Products Hydrogen @ Garyville

Gulf South Pipeline · Loc 22493
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.059
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.056
Bcf/d
30-day average
0.053
30 of 30 days posted
30-day high
0.059
Nov 26
30-day low
0.040
Nov 17
Operating capacity
0.122
Bcf/d as posted, eve cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.059+0.000
Nov 250.059+0.002
Nov 240.057+0.003
Nov 230.054-0.003
Nov 220.057+0.003
Nov 210.054+0.000
Nov 200.054+0.000
Nov 190.054+0.000
Nov 180.054+0.013
Nov 170.040-0.013
Nov 160.054-0.000
Nov 150.054-0.001
Nov 140.055-0.004
Nov 130.059-0.000
Nov 120.059+0.011
Nov 110.048-0.003
Nov 100.051-0.005
Nov 90.056-0.003
Nov 80.059+0.011
Nov 70.048-0.004
Nov 60.053+0.009
Nov 50.044-0.004
Nov 40.049-0.004
Nov 30.053+0.007
Nov 20.046-0.003
Nov 10.049-0.002
Oct 310.051+0.003
Oct 300.049+0.002
Oct 290.047-0.003
Oct 280.050—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Air Products Hydrogen @ Garyville (Gulf South Pipeline loc 22493) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/22493/