Air Products - Norco

Gulf South Pipeline · Loc 23042
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.049
Bcf/d scheduled
Δ Day-over-day
-0.015
vs Nov 25
7-day average
0.064
Bcf/d
30-day average
0.055
30 of 30 days posted
30-day high
0.081
Nov 21
30-day low
0.041
Nov 2
Operating capacity
0.137
Bcf/d as posted, eve cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.049-0.015
Nov 250.064+0.010
Nov 240.054-0.018
Nov 230.072-0.008
Nov 220.080-0.001
Nov 210.081+0.029
Nov 200.052-0.005
Nov 190.057-0.008
Nov 180.065+0.005
Nov 170.060+0.009
Nov 160.051-0.001
Nov 150.052+0.002
Nov 140.049-0.005
Nov 130.054+0.004
Nov 120.050+0.008
Nov 110.042-0.002
Nov 100.043-0.008
Nov 90.051-0.012
Nov 80.063+0.010
Nov 70.052-0.005
Nov 60.057+0.013
Nov 50.043-0.010
Nov 40.053+0.003
Nov 30.050+0.009
Nov 20.041-0.009
Nov 10.050-0.005
Oct 310.055+0.002
Oct 300.053-0.001
Oct 290.054-0.003
Oct 280.057—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Air Products - Norco (Gulf South Pipeline loc 23042) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/23042/