Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Westlake: Lake Charles South Plant

Gulf South Pipeline · Loc 9311
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.037
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.041
Bcf/d
30-day average
0.035
30 of 30 days posted
30-day high
0.046
Nov 23
30-day low
0.013
Nov 2
Operating capacity
0.193
Bcf/d as posted, eve cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.037+0.000
Nov 250.037+0.007
Nov 240.030-0.016
Nov 230.046+0.000
Nov 220.046+0.000
Nov 210.046+0.002
Nov 200.044+0.000
Nov 190.044-0.001
Nov 180.045-0.001
Nov 170.046+0.014
Nov 160.032+0.000
Nov 150.032+0.000
Nov 140.032+0.000
Nov 130.032-0.003
Nov 120.035-0.010
Nov 110.045+0.000
Nov 100.045+0.007
Nov 90.038+0.000
Nov 80.038+0.000
Nov 70.038+0.003
Nov 60.035+0.015
Nov 50.020-0.003
Nov 40.023-0.012
Nov 30.035+0.022
Nov 20.013-0.001
Nov 10.014-0.011
Oct 310.025+0.000
Oct 300.025-0.005
Oct 290.030-0.005
Oct 280.035—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South Pipeline

Gulf South PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Westlake: Lake Charles South Plant (Gulf South Pipeline loc 9311) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/9311/