Pascagoula High Pressure (To Chevron)

Gulf South Pipeline · Loc 24251 · Jackson, Mississippi
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.071
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.073
Bcf/d
30-day average
0.071
30 of 30 days posted
30-day high
0.074
Nov 23
30-day low
0.064
Oct 29
Operating capacity
0.128
Bcf/d as posted, eve cycle
Utilization
56%
headroom 44%

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.071+0.000
Nov 260.071-0.003
Nov 250.074+0.000
Nov 240.074-0.000
Nov 230.074+0.000
Nov 220.074+0.000
Nov 210.074+0.003
Nov 200.071-0.001
Nov 190.072+0.000
Nov 180.072+0.001
Nov 170.071-0.001
Nov 160.072+0.000
Nov 150.072+0.000
Nov 140.072+0.000
Nov 130.072+0.000
Nov 120.072+0.000
Nov 110.072+0.000
Nov 100.072-0.001
Nov 90.072+0.000
Nov 80.072+0.000
Nov 70.072+0.007
Nov 60.066-0.007
Nov 50.072+0.000
Nov 40.072+0.007
Nov 30.066-0.006
Nov 20.072+0.000
Nov 10.072+0.004
Oct 310.068-0.000
Oct 300.069+0.005
Oct 290.064—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelinePascagoula High Pressure (To Chevron)

Gulf South PipelinePlaced at the center of Jackson, MS — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Pascagoula High Pressure (To Chevron) (Gulf South Pipeline loc 24251) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/24251/