Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

Ip Paper Mill @ Wiggins-Entex

Gulf South Pipeline · Loc 20847 · Stone, Mississippi
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.000
Nov 27
30-day low
0.000
Nov 27
Operating capacity
0.000
Bcf/d as posted, eve cycle
Utilization
110%
scheduled above operating capacity

Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0000.0000.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf South PipelineIp Paper Mill @ Wiggins-Entex

Gulf South PipelinePlaced at the center of Stone, MS — approximate; the exact meter site is not published.

Recent notices on Gulf South Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →

Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Ip Paper Mill @ Wiggins-Entex (Gulf South Pipeline loc 20847) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfsouth/20847/