SILSBEE HARDIN COUNTY INTERCONNECT - HOUSTON PIPE LINE

Trunkline Gas Company · Loc 82741 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.029
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.018
Bcf/d
30-day average
0.025
30 of 30 days posted
30-day high
0.064
Nov 10
30-day low
0.000
Nov 20
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Trunkline Gas Company on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.029-0.001
Nov 250.030+0.006
Nov 240.024+0.009
Nov 230.015+0.000
Nov 220.015+0.000
Nov 210.015+0.015
Nov 200.000-0.014
Nov 190.014-0.016
Nov 180.030+0.011
Nov 170.019-0.002
Nov 160.021+0.000
Nov 150.021+0.000
Nov 140.021-0.034
Nov 130.054-0.006
Nov 120.060+0.000
Nov 110.060-0.004
Nov 100.064+0.014
Nov 90.050+0.000
Nov 80.050+0.000
Nov 70.050+0.000
Nov 60.050+0.000
Nov 50.050+0.050
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Trunkline Gas

Trunkline GasState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Trunkline Gas Company

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Trunkline Gas Company notices →

Trunkline Gas Company · posted 2026-11-09 · effective 2026-11-09 · maintenance
Trunkline Gas Company will perform planned maintenance at Kountze Compressor Station (MP -73.7) on Gas Days December 8-9, 2026, reducing all forward haul nominations traversing this location to zero for the two-day window. No specific capacity volume is stated in the notice, thou…