Gas day Nov 26
-0.091
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.093
Bcf/d
30-day average
-0.099
30 of 30 days posted
30-day high
-0.086
Nov 22
30-day low
-0.110
Nov 2
Operating capacity
0.110
Bcf/d as posted, none cycle
Utilization
83%
headroom 17%
Scheduled quantities as posted by Trunkline Gas Company on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | -0.091 | +0.000 |
| Nov 25 | -0.091 | +0.000 |
| Nov 24 | -0.091 | +0.000 |
| Nov 23 | -0.091 | -0.005 |
| Nov 22 | -0.086 | +0.015 |
| Nov 21 | -0.101 | +0.000 |
| Nov 20 | -0.101 | -0.001 |
| Nov 19 | -0.100 | -0.004 |
| Nov 18 | -0.096 | +0.002 |
| Nov 17 | -0.098 | +0.000 |
| Nov 16 | -0.098 | -0.000 |
| Nov 15 | -0.098 | +0.000 |
| Nov 14 | -0.098 | -0.003 |
| Nov 13 | -0.095 | +0.001 |
| Nov 12 | -0.096 | +0.000 |
| Nov 11 | -0.096 | +0.009 |
| Nov 10 | -0.105 | -0.010 |
| Nov 9 | -0.095 | +0.000 |
| Nov 8 | -0.095 | +0.000 |
| Nov 7 | -0.095 | +0.000 |
| Nov 6 | -0.095 | +0.000 |
| Nov 5 | -0.095 | +0.000 |
| Nov 4 | -0.095 | +0.006 |
| Nov 3 | -0.101 | +0.009 |
| Nov 2 | -0.110 | +0.000 |
| Nov 1 | -0.110 | +0.000 |
| Oct 31 | -0.110 | +0.000 |
| Oct 30 | -0.110 | +0.000 |
| Oct 29 | -0.110 | +0.000 |
| Oct 28 | -0.110 | — |
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Trunkline GasState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Trunkline Gas Company
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Trunkline Gas Company notices →
Trunkline Gas Company · posted 2026-11-09 · effective 2026-11-09 · maintenance
Trunkline Gas Company will perform planned maintenance at Kountze Compressor Station (MP -73.7) on Gas Days December 8-9, 2026, reducing all forward haul nominations traversing this location to zero for the two-day window. No specific capacity volume is stated in the notice, thou…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Trunkline Gas Company
- TRUNKLINE-MATTERHORN INTERCONNECT 0.200 Bcf/d
- TGC REGENCY INTRASTATE GAS INTERCONNECT 0.130 Bcf/d
- ENLINK LIG @ PATTERSON -0.072 Bcf/d
- TGC - TARGA INTERCONNECT AT BIG LAKE ROAD -0.070 Bcf/d
- SILSBEE - MIDCOAST PIPELINES (EAST TEXAS) 0.057 Bcf/d
- CENTERPOINT FOWLER -0.050 Bcf/d
- WHARTON CO - ENTERPRISE TEXAS PIPELINE 0.040 Bcf/d
- NEPTUNE PLANT 0.034 Bcf/d
Cite thisEnercast PipeScrape, BRIDGELINE PATTERSON - BRIDGELINE (Trunkline Gas Company loc 80578) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trunkline/80578/