Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TGC REGENCY INTRASTATE GAS INTERCONNECT

Trunkline Gas Company · Loc 82804 · Louisiana
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.130
Bcf/d scheduled
Δ Day-over-day
-0.022
vs Nov 25
7-day average
0.125
Bcf/d
30-day average
0.130
30 of 30 days posted
30-day high
0.164
Nov 24
30-day low
0.100
Nov 23
Operating capacity
0.350
Bcf/d as posted, none cycle
Utilization
37%
headroom 63%

Scheduled quantities as posted by Trunkline Gas Company on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.130-0.022
Nov 250.152-0.012
Nov 240.164+0.063
Nov 230.100-0.016
Nov 220.116+0.006
Nov 210.111+0.008
Nov 200.103-0.005
Nov 190.108+0.003
Nov 180.105-0.017
Nov 170.122-0.007
Nov 160.129-0.005
Nov 150.134+0.000
Nov 140.134+0.002
Nov 130.132-0.013
Nov 120.145+0.000
Nov 110.145+0.003
Nov 100.143-0.008
Nov 90.151+0.005
Nov 80.146-0.005
Nov 70.151+0.004
Nov 60.146+0.028
Nov 50.118-0.020
Nov 40.138-0.005
Nov 30.144+0.023
Nov 20.121-0.000
Nov 10.121+0.008
Oct 310.114+0.000
Oct 300.114+0.008
Oct 290.105-0.053
Oct 280.158—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Trunkline Gas

Trunkline GasState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Trunkline Gas Company

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Trunkline Gas Company notices →

Trunkline Gas Company · posted 2026-11-09 · effective 2026-11-09 · maintenance
Trunkline Gas Company will perform planned maintenance at Kountze Compressor Station (MP -73.7) on Gas Days December 8-9, 2026, reducing all forward haul nominations traversing this location to zero for the two-day window. No specific capacity volume is stated in the notice, thou…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGC REGENCY INTRASTATE GAS INTERCONNECT (Trunkline Gas Company loc 82804) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trunkline/82804/