Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

WHARTON CO - ENTERPRISE TEXAS PIPELINE

Trunkline Gas Company · Loc 81526 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.040
Bcf/d scheduled
Δ Day-over-day
-0.030
vs Nov 25
7-day average
0.039
Bcf/d
30-day average
0.041
30 of 30 days posted
30-day high
0.114
Nov 13
30-day low
0.000
Nov 5
Operating capacity
0.300
Bcf/d as posted, none cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Trunkline Gas Company on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.040-0.030
Nov 250.070+0.009
Nov 240.061+0.034
Nov 230.028+0.005
Nov 220.023+0.000
Nov 210.023-0.006
Nov 200.029-0.061
Nov 190.090+0.050
Nov 180.040+0.000
Nov 170.040+0.005
Nov 160.035+0.000
Nov 150.035-0.005
Nov 140.040-0.074
Nov 130.114+0.004
Nov 120.110+0.000
Nov 110.110+0.040
Nov 100.070+0.060
Nov 90.010+0.000
Nov 80.010+0.000
Nov 70.010-0.065
Nov 60.075+0.075
Nov 50.000-0.058
Nov 40.058-0.042
Nov 30.100+0.100
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Trunkline Gas

Trunkline GasState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Trunkline Gas Company

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Trunkline Gas Company notices →

Trunkline Gas Company · posted 2026-11-09 · effective 2026-11-09 · maintenance
Trunkline Gas Company will perform planned maintenance at Kountze Compressor Station (MP -73.7) on Gas Days December 8-9, 2026, reducing all forward haul nominations traversing this location to zero for the two-day window. No specific capacity volume is stated in the notice, thou…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WHARTON CO - ENTERPRISE TEXAS PIPELINE (Trunkline Gas Company loc 81526) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trunkline/81526/