COAL MINE METHANE PLANT - KEYROCK ENERGY

Trunkline Gas Company · Loc 82671 · Illinois
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.002
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.004
Nov 11
30-day low
0.000
Nov 9
Operating capacity
0.012
Bcf/d as posted, none cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Trunkline Gas Company on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0010.0020.0030.004Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.002+0.000
Nov 250.002-0.000
Nov 240.002+0.000
Nov 230.002+0.000
Nov 220.002+0.000
Nov 210.002-0.002
Nov 200.004+0.002
Nov 190.002+0.000
Nov 180.002-0.000
Nov 170.002+0.000
Nov 160.002-0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.000
Nov 120.002-0.002
Nov 110.004+0.002
Nov 100.002+0.002
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000-0.002
Nov 30.002+0.001
Nov 20.001+0.000
Nov 10.001-0.001
Oct 310.002+0.000
Oct 300.002-0.001
Oct 290.002+0.000
Oct 280.002—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Trunkline Gas

Trunkline GasState only (Illinois) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Trunkline Gas Company

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Trunkline Gas Company notices →

Trunkline Gas Company · posted 2026-11-09 · effective 2026-11-09 · maintenance
Trunkline Gas Company will perform planned maintenance at Kountze Compressor Station (MP -73.7) on Gas Days December 8-9, 2026, reducing all forward haul nominations traversing this location to zero for the two-day window. No specific capacity volume is stated in the notice, thou…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.