Gas day Nov 27
-0.100
Bcf/d scheduled
Δ Day-over-day
-0.022
vs Nov 26
7-day average
-0.082
Bcf/d
30-day average
-0.060
30 of 30 days posted
30-day high
-0.000
Nov 19
30-day low
-0.100
Nov 27
Operating capacity
0.602
Bcf/d as posted, late_0005 cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

-0.15-0.10-0.05-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.100-0.022
Nov 26-0.078+0.000
Nov 25-0.078-0.007
Nov 24-0.071+0.004
Nov 23-0.075-0.003
Nov 22-0.072+0.028
Nov 21-0.100-0.028
Nov 20-0.072-0.072
Nov 19-0.000+0.068
Nov 18-0.068+0.005
Nov 17-0.073+0.000
Nov 16-0.073+0.000
Nov 15-0.073-0.007
Nov 14-0.066+0.013
Nov 13-0.080-0.056
Nov 12-0.024+0.002
Nov 11-0.026+0.000
Nov 10-0.026+0.003
Nov 9-0.029+0.024
Nov 8-0.053+0.000
Nov 7-0.053+0.000
Nov 6-0.053+0.047
Nov 5-0.100-0.004
Nov 4-0.096-0.031
Nov 3-0.065-0.005
Nov 2-0.060-0.010
Nov 1-0.050-0.025
Oct 31-0.025+0.000
Oct 30-0.025+0.000
Oct 29-0.025—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.