Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Monroe Gas Storage (injection, Texas Eastern Transmission (TETCO))

Texas Eastern Transmission (TETCO) · Loc 75578 · Appalachia
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
-0.360
Bcf/d scheduled
Δ Day-over-day
-0.003
vs Nov 26
7-day average
-0.397
Bcf/d
30-day average
-0.400
30 of 30 days posted
30-day high
-0.273
Nov 15
30-day low
-0.479
Oct 30
Operating capacity
0.509
Bcf/d as posted, late_0005 cycle
Utilization
71%
headroom 29%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

-0.60-0.40-0.20-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.360-0.003
Nov 26-0.357+0.028
Nov 25-0.385+0.048
Nov 24-0.433-0.042
Nov 23-0.391+0.034
Nov 22-0.426+0.000
Nov 21-0.426-0.025
Nov 20-0.400-0.007
Nov 19-0.393-0.010
Nov 18-0.383+0.024
Nov 17-0.407-0.128
Nov 16-0.279-0.006
Nov 15-0.273+0.000
Nov 14-0.273+0.134
Nov 13-0.407-0.002
Nov 12-0.405+0.001
Nov 11-0.406-0.021
Nov 10-0.386-0.029
Nov 9-0.357+0.016
Nov 8-0.373+0.021
Nov 7-0.394+0.060
Nov 6-0.454-0.011
Nov 5-0.443-0.015
Nov 4-0.428-0.010
Nov 3-0.417+0.033
Nov 2-0.450+0.012
Nov 1-0.462+0.018
Oct 31-0.479+0.000
Oct 30-0.479-0.004
Oct 29-0.476—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Monroe Gas Storage (injection, Texas Eastern Transmission (TETCO)) (Texas Eastern Transmission (TETCO) loc 75578) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/75578/