Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Moss Bluff Gas Storage (Chambers Co., TX) (withdrawal, Texas Eastern Transmission (TETCO))

Texas Eastern Transmission (TETCO) · Loc 75773 · Gulf Coast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.207
Bcf/d scheduled
Δ Day-over-day
+0.137
vs Nov 26
7-day average
+0.154
Bcf/d
30-day average
+0.114
30 of 30 days posted
30-day high
+0.224
Nov 6
30-day low
+0.018
Oct 29
Operating capacity
0.684
Bcf/d as posted, late_0005 cycle
Utilization
30%
headroom 70%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.207+0.137
Nov 26+0.070-0.045
Nov 25+0.116-0.090
Nov 24+0.205+0.066
Nov 23+0.139-0.007
Nov 22+0.146-0.046
Nov 21+0.192+0.124
Nov 20+0.068-0.009
Nov 19+0.077-0.015
Nov 18+0.091+0.053
Nov 17+0.038-0.038
Nov 16+0.076-0.006
Nov 15+0.082+0.046
Nov 14+0.036-0.000
Nov 13+0.036-0.052
Nov 12+0.089+0.045
Nov 11+0.043-0.114
Nov 10+0.158-0.032
Nov 9+0.190+0.038
Nov 8+0.152-0.003
Nov 7+0.155-0.069
Nov 6+0.224+0.058
Nov 5+0.167+0.047
Nov 4+0.120-0.025
Nov 3+0.145+0.091
Nov 2+0.053-0.108
Nov 1+0.161+0.012
Oct 31+0.149+0.119
Oct 30+0.030+0.013
Oct 29+0.018—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)

Texas Eastern (TETCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Moss Bluff Gas Storage (Chambers Co., TX) (withdrawal, Texas Eastern Transmission (TETCO)) (Texas Eastern Transmission (TETCO) loc 75773) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/75773/