Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Pone Run

Columbia Gas Transmission (TCO) · Loc PONERUN · West Virginia
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.083
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.084
Bcf/d
30-day average
0.080
30 of 30 days posted
30-day high
0.086
Oct 29
30-day low
0.067
Nov 16
Operating capacity
0.200
Bcf/d as posted, timely cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.083-0.000
Nov 250.083-0.001
Nov 240.084+0.000
Nov 230.084+0.000
Nov 220.084+0.000
Nov 210.084+0.000
Nov 200.084+0.000
Nov 190.084+0.000
Nov 180.084+0.001
Nov 170.083+0.016
Nov 160.067+0.000
Nov 150.067+0.000
Nov 140.067-0.017
Nov 130.084+0.001
Nov 120.084+0.000
Nov 110.084+0.000
Nov 100.084+0.003
Nov 90.081+0.000
Nov 80.081+0.000
Nov 70.081+0.001
Nov 60.080+0.001
Nov 50.079-0.001
Nov 40.080+0.000
Nov 30.080+0.010
Nov 20.070+0.000
Nov 10.070-0.012
Oct 310.082+0.000
Oct 300.082-0.003
Oct 290.086+0.008
Oct 280.077—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Pone Run (Columbia Gas Transmission (TCO) loc PONERUN) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/ponerun/