Gas day Nov 27
0.350
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.323
Bcf/d
30-day average
0.294
30 of 30 days posted
30-day high
0.360
Nov 19
30-day low
0.180
Nov 2
Operating capacity
1.000
Bcf/d as posted, timely cycle
Utilization
35%
headroom 65%
Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.350 | +0.000 |
| Nov 26 | 0.350 | +0.050 |
| Nov 25 | 0.300 | +0.086 |
| Nov 24 | 0.214 | -0.136 |
| Nov 23 | 0.350 | +0.000 |
| Nov 22 | 0.350 | +0.000 |
| Nov 21 | 0.350 | +0.016 |
| Nov 20 | 0.334 | -0.026 |
| Nov 19 | 0.360 | +0.093 |
| Nov 18 | 0.266 | -0.003 |
| Nov 17 | 0.269 | -0.039 |
| Nov 16 | 0.308 | +0.000 |
| Nov 15 | 0.308 | +0.005 |
| Nov 14 | 0.303 | -0.040 |
| Nov 13 | 0.344 | +0.018 |
| Nov 12 | 0.326 | +0.000 |
| Nov 11 | 0.326 | +0.024 |
| Nov 10 | 0.302 | +0.006 |
| Nov 9 | 0.296 | +0.019 |
| Nov 8 | 0.278 | -0.016 |
| Nov 7 | 0.293 | +0.011 |
| Nov 6 | 0.282 | -0.063 |
| Nov 5 | 0.346 | +0.011 |
| Nov 4 | 0.335 | +0.009 |
| Nov 3 | 0.326 | +0.145 |
| Nov 2 | 0.180 | -0.001 |
| Nov 1 | 0.181 | -0.023 |
| Oct 31 | 0.204 | +0.000 |
| Oct 30 | 0.204 | +0.008 |
| Oct 29 | 0.196 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Columbia Gas Transmission (TCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on Columbia Gas Transmission (TCO)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →
Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Columbia Gas Transmission (TCO)
- Sherwood - MXP 0.809 Bcf/d
- OAK GROVE LEACH 0.372 Bcf/d
- Majorsville - LXP 0.344 Bcf/d
- DRY RIDGE M&R 0.343 Bcf/d
- Ft. Beeler 0.328 Bcf/d
- CORRAL 0.271 Bcf/d
- WADESTOWN M&R 0.245 Bcf/d
- SMITHFIELD - MOBLEY 0.205 Bcf/d
Cite thisEnercast PipeScrape, Eureka (Columbia Gas Transmission (TCO) loc 743103) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/743103/