Gas day Nov 26
0.271
Bcf/d scheduled
Δ Day-over-day
+0.063
vs Nov 25
7-day average
0.241
Bcf/d
30-day average
0.269
30 of 30 days posted
30-day high
0.366
Oct 29
30-day low
0.208
Nov 25
Operating capacity
0.390
Bcf/d as posted, timely cycle
Utilization
70%
headroom 30%
Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.271 | +0.063 |
| Nov 25 | 0.208 | -0.036 |
| Nov 24 | 0.244 | +0.004 |
| Nov 23 | 0.240 | +0.000 |
| Nov 22 | 0.240 | +0.000 |
| Nov 21 | 0.240 | -0.005 |
| Nov 20 | 0.245 | -0.027 |
| Nov 19 | 0.272 | +0.000 |
| Nov 18 | 0.272 | +0.000 |
| Nov 17 | 0.272 | +0.010 |
| Nov 16 | 0.262 | +0.000 |
| Nov 15 | 0.262 | +0.000 |
| Nov 14 | 0.262 | +0.010 |
| Nov 13 | 0.252 | -0.044 |
| Nov 12 | 0.295 | +0.000 |
| Nov 11 | 0.295 | -0.001 |
| Nov 10 | 0.296 | -0.010 |
| Nov 9 | 0.306 | -0.019 |
| Nov 8 | 0.325 | +0.019 |
| Nov 7 | 0.306 | +0.035 |
| Nov 6 | 0.272 | +0.008 |
| Nov 5 | 0.264 | +0.035 |
| Nov 4 | 0.229 | +0.002 |
| Nov 3 | 0.228 | +0.004 |
| Nov 2 | 0.224 | +0.007 |
| Nov 1 | 0.217 | -0.108 |
| Oct 31 | 0.325 | +0.000 |
| Oct 30 | 0.325 | -0.041 |
| Oct 29 | 0.366 | +0.109 |
| Oct 28 | 0.257 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Columbia Gas Transmission (TCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on Columbia Gas Transmission (TCO)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →
Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Columbia Gas Transmission (TCO)
- Sherwood - MXP 0.809 Bcf/d
- OAK GROVE LEACH 0.366 Bcf/d
- Eureka 0.350 Bcf/d
- Majorsville - LXP 0.344 Bcf/d
- DRY RIDGE M&R 0.343 Bcf/d
- Ft. Beeler 0.328 Bcf/d
- WADESTOWN M&R 0.246 Bcf/d
- SMITHFIELD - MOBLEY 0.205 Bcf/d
Cite thisEnercast PipeScrape, CORRAL (Columbia Gas Transmission (TCO) loc 643131) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/643131/