Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DRY RIDGE M&R

Columbia Gas Transmission (TCO) · Loc 643111 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.343
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.344
Bcf/d
30-day average
0.350
30 of 30 days posted
30-day high
0.382
Nov 10
30-day low
0.343
Nov 24
Operating capacity
0.676
Bcf/d as posted, timely cycle
Utilization
51%
headroom 49%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.343+0.000
Nov 260.343-0.004
Nov 250.347+0.004
Nov 240.343-0.002
Nov 230.345+0.000
Nov 220.345+0.000
Nov 210.345+0.000
Nov 200.345-0.007
Nov 190.352+0.000
Nov 180.352-0.004
Nov 170.356+0.008
Nov 160.348+0.000
Nov 150.348+0.000
Nov 140.348+0.000
Nov 130.348-0.004
Nov 120.352+0.000
Nov 110.352-0.030
Nov 100.382+0.035
Nov 90.347+0.000
Nov 80.347+0.000
Nov 70.347-0.001
Nov 60.348-0.003
Nov 50.351-0.001
Nov 40.352-0.007
Nov 30.360+0.004
Nov 20.355+0.000
Nov 10.355+0.001
Oct 310.354+0.000
Oct 300.354+0.006
Oct 290.348—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DRY RIDGE M&R (Columbia Gas Transmission (TCO) loc 643111) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/643111/