BEAVER CREEK-16

Columbia Gas Transmission (TCO) · Loc H1 · Kentucky
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.059
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.062
Bcf/d
30-day average
0.063
30 of 30 days posted
30-day high
0.065
Oct 31
30-day low
0.059
Nov 27
Operating capacity
0.091
Bcf/d as posted, timely cycle
Utilization
65%
headroom 35%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.059+0.000
Nov 260.059-0.004
Nov 250.063+0.000
Nov 240.063+0.000
Nov 230.063+0.000
Nov 220.063+0.000
Nov 210.063+0.000
Nov 200.063+0.000
Nov 190.063+0.000
Nov 180.063+0.000
Nov 170.063+0.000
Nov 160.063+0.000
Nov 150.063+0.000
Nov 140.063+0.000
Nov 130.063+0.000
Nov 120.063+0.000
Nov 110.063+0.000
Nov 100.063+0.000
Nov 90.063+0.000
Nov 80.063+0.000
Nov 70.063+0.000
Nov 60.063+0.000
Nov 50.063+0.001
Nov 40.063-0.001
Nov 30.063+0.001
Nov 20.062+0.001
Nov 10.061-0.004
Oct 310.065+0.000
Oct 300.065+0.000
Oct 290.065—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (Kentucky) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BEAVER CREEK-16 (Columbia Gas Transmission (TCO) loc H1) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/h1/