Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

LANHAM-19

Columbia Gas Transmission (TCO) · Loc G1 · West Virginia
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.020
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.016
Bcf/d
30-day average
0.016
7 of 30 days posted
30-day high
0.020
Nov 26
30-day low
0.016
Nov 25
Operating capacity
0.037
Bcf/d as posted, timely cycle
Utilization
53%
headroom 47%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.020+0.004
Nov 250.016+0.000
Nov 240.016+0.000
Nov 230.016+0.000
Nov 220.016+0.000
Nov 210.016+0.000
Nov 200.016—
Nov 19——
Nov 18——
Nov 17——
Nov 16——
Nov 15——
Nov 14——
Nov 13——
Nov 12——
Nov 11——
Nov 10——
Nov 9——
Nov 8——
Nov 7——
Nov 6——
Nov 5——
Nov 4——
Nov 3——
Nov 2——
Nov 1——
Oct 31——
Oct 30——
Oct 29——
Oct 28——
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LANHAM-19 (Columbia Gas Transmission (TCO) loc G1) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/g1/