Gas day Nov 26
0.017
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.017
Bcf/d
30-day average
0.017
26 of 30 days posted
30-day high
0.017
Nov 26
30-day low
0.017
Nov 13
Operating capacity
0.057
Bcf/d as posted, timely cycle
Utilization
30%
headroom 70%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.017+0.000
Nov 250.017+0.000
Nov 240.017+0.000
Nov 230.017+0.000
Nov 220.017+0.000
Nov 210.017+0.000
Nov 200.017+0.000
Nov 190.017+0.000
Nov 180.017+0.000
Nov 170.017+0.000
Nov 160.017+0.000
Nov 150.017+0.000
Nov 140.017+0.000
Nov 130.017-0.000
Nov 120.017+0.000
Nov 110.017+0.000
Nov 100.017+0.000
Nov 90.017+0.000
Nov 80.017+0.000
Nov 70.017+0.000
Nov 60.017+0.000
Nov 50.017+0.000
Nov 40.017-0.000
Nov 30.017+0.000
Nov 20.017-0.000
Nov 10.017—
Oct 31——
Oct 30——
Oct 29——
Oct 28——
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CHK - KERMIT/INEZ (Columbia Gas Transmission (TCO) loc CNR04) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/cnr04/