Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

James Massey Hub Lane 2

Columbia Gas Transmission (TCO) · Loc 900002 · North Carolina
Processing plant · counted in Supply / Production
Gas day Nov 27
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.004
Nov 16
30-day low
0.000
Nov 22
Operating capacity
0.005
Bcf/d as posted, timely cycle
Utilization
22%
headroom 78%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0020.0040.006Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.001+0.000
Nov 260.001-0.001
Nov 250.002+0.000
Nov 240.002+0.002
Nov 230.000+0.000
Nov 220.000-0.000
Nov 210.000-0.002
Nov 200.002+0.000
Nov 190.002+0.000
Nov 180.002+0.000
Nov 170.002-0.002
Nov 160.004+0.000
Nov 150.004+0.000
Nov 140.004+0.001
Nov 130.003+0.000
Nov 120.003+0.003
Nov 110.000+0.000
Nov 100.000-0.002
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002-0.000
Nov 60.002+0.000
Nov 50.002+0.000
Nov 40.002-0.000
Nov 30.002+0.001
Nov 20.002+0.000
Nov 10.002-0.001
Oct 310.003-0.000
Oct 300.003+0.000
Oct 290.003—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (North Carolina) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, James Massey Hub Lane 2 (Columbia Gas Transmission (TCO) loc 900002) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/900002/