Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

SMITHFIELD - MOBLEY

Columbia Gas Transmission (TCO) · Loc 642824 · West Virginia
Processing plant · counted in Supply / Production
Gas day Nov 26
0.205
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 25
7-day average
0.194
Bcf/d
30-day average
0.217
30 of 30 days posted
30-day high
0.280
Oct 31
30-day low
0.119
Oct 28
Operating capacity
0.300
Bcf/d as posted, timely cycle
Utilization
68%
headroom 32%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.205+0.005
Nov 250.200+0.009
Nov 240.191-0.002
Nov 230.193+0.000
Nov 220.192+0.000
Nov 210.192+0.007
Nov 200.185+0.003
Nov 190.182+0.001
Nov 180.182+0.001
Nov 170.181-0.026
Nov 160.207+0.000
Nov 150.207+0.000
Nov 140.207-0.014
Nov 130.221+0.006
Nov 120.215-0.012
Nov 110.227-0.009
Nov 100.236-0.011
Nov 90.247+0.000
Nov 80.247+0.000
Nov 70.247+0.013
Nov 60.234+0.005
Nov 50.228-0.005
Nov 40.234+0.014
Nov 30.220-0.030
Nov 20.249+0.006
Nov 10.243-0.036
Oct 310.280+0.000
Oct 300.280+0.017
Oct 290.263+0.144
Oct 280.119—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SMITHFIELD - MOBLEY (Columbia Gas Transmission (TCO) loc 642824) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/642824/