Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

UGI CORP-25

Columbia Gas Transmission (TCO) · Loc 72-25 · Pennsylvania
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
-0.049
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 26
7-day average
-0.078
Bcf/d
30-day average
-0.072
30 of 30 days posted
30-day high
-0.045
Nov 2
30-day low
-0.112
Nov 22
Operating capacity
0.252
Bcf/d as posted, timely cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.15-0.10-0.05-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.049-0.001
Nov 26-0.049+0.029
Nov 25-0.078+0.003
Nov 24-0.081+0.006
Nov 23-0.087+0.025
Nov 22-0.112-0.022
Nov 21-0.091+0.001
Nov 20-0.092+0.009
Nov 19-0.101-0.019
Nov 18-0.083-0.036
Nov 17-0.046+0.036
Nov 16-0.083+0.022
Nov 15-0.105-0.026
Nov 14-0.079+0.005
Nov 13-0.085-0.017
Nov 12-0.068-0.001
Nov 11-0.067+0.013
Nov 10-0.080-0.021
Nov 9-0.059+0.024
Nov 8-0.083-0.023
Nov 7-0.060+0.008
Nov 6-0.068-0.004
Nov 5-0.064-0.019
Nov 4-0.045+0.009
Nov 3-0.055-0.010
Nov 2-0.045+0.001
Nov 1-0.046+0.019
Oct 31-0.066-0.002
Oct 30-0.064+0.012
Oct 29-0.076—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI CORP-25 (Columbia Gas Transmission (TCO) loc 72-25) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/72-25/