Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Gibraltar III

Columbia Gas Transmission (TCO) · Loc 643053 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.199
Bcf/d scheduled
Δ Day-over-day
+0.021
vs Nov 25
7-day average
0.188
Bcf/d
30-day average
0.163
30 of 30 days posted
30-day high
0.200
Nov 24
30-day low
0.106
Oct 28
Operating capacity
1.000
Bcf/d as posted, timely cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.199+0.021
Nov 250.178-0.022
Nov 240.200+0.009
Nov 230.191+0.000
Nov 220.191+0.012
Nov 210.179-0.002
Nov 200.181-0.010
Nov 190.191+0.019
Nov 180.172+0.062
Nov 170.110-0.062
Nov 160.172+0.000
Nov 150.172+0.000
Nov 140.172-0.001
Nov 130.173+0.010
Nov 120.163+0.000
Nov 110.163+0.023
Nov 100.140-0.016
Nov 90.156-0.002
Nov 80.158+0.000
Nov 70.158+0.005
Nov 60.152+0.002
Nov 50.151-0.008
Nov 40.159+0.013
Nov 30.146-0.014
Nov 20.160+0.006
Nov 10.154+0.009
Oct 310.145+0.000
Oct 300.145-0.003
Oct 290.148+0.041
Oct 280.106—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Gibraltar III (Columbia Gas Transmission (TCO) loc 643053) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/643053/