Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Veres

Columbia Gas Transmission (TCO) · Loc 642822
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.075
Bcf/d scheduled
Δ Day-over-day
-0.010
vs Nov 25
7-day average
0.073
Bcf/d
30-day average
0.076
30 of 30 days posted
30-day high
0.088
Nov 4
30-day low
0.069
Oct 29
Operating capacity
0.130
Bcf/d as posted, timely cycle
Utilization
58%
headroom 42%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0250.0500.0750.100Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.075-0.010
Nov 250.085+0.012
Nov 240.073+0.003
Nov 230.070+0.000
Nov 220.070+0.000
Nov 210.070+0.000
Nov 200.070+0.000
Nov 190.070-0.004
Nov 180.074-0.005
Nov 170.079+0.000
Nov 160.079+0.000
Nov 150.079+0.000
Nov 140.079+0.002
Nov 130.077+0.001
Nov 120.076+0.000
Nov 110.076-0.010
Nov 100.086+0.009
Nov 90.078+0.000
Nov 80.078+0.001
Nov 70.076-0.001
Nov 60.078+0.000
Nov 50.078-0.010
Nov 40.088+0.006
Nov 30.082+0.004
Nov 20.077+0.004
Nov 10.074+0.001
Oct 310.073+0.000
Oct 300.073+0.004
Oct 290.069-0.006
Oct 280.075—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Veres (Columbia Gas Transmission (TCO) loc 642822) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/642822/