Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

LANCASTER,CITY OF-9

Columbia Gas Transmission (TCO) · Loc 45-9 · FAIRFIELD, Ohio
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.003
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.003
Nov 26
30-day low
0.001
Oct 31
Operating capacity
0.019
Bcf/d as posted, timely cycle
Utilization
13%
headroom 87%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0020.003Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.003+0.000
Nov 250.003+0.000
Nov 240.003+0.000
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.000
Nov 190.003+0.000
Nov 180.003+0.000
Nov 170.003+0.000
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.003+0.000
Nov 120.003+0.000
Nov 110.003+0.000
Nov 100.003+0.000
Nov 90.003+0.000
Nov 80.003+0.000
Nov 70.003+0.000
Nov 60.003+0.000
Nov 50.003+0.000
Nov 40.003+0.000
Nov 30.003+0.000
Nov 20.003+0.000
Nov 10.003+0.002
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001+0.000
Oct 280.001—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)LANCASTER,CITY OF-9

Columbia Gas Transmission (TCO)Placed at the center of Fairfield, OH — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LANCASTER,CITY OF-9 (Columbia Gas Transmission (TCO) loc 45-9) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/45-9/