Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

COL GAS OH OP 07-5

Columbia Gas Transmission (TCO) · Loc 23-5 · HANCOCK, Ohio
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.294
Bcf/d scheduled
Δ Day-over-day
+0.017
vs Nov 25
7-day average
0.227
Bcf/d
30-day average
0.177
30 of 30 days posted
30-day high
0.294
Nov 26
30-day low
0.060
Oct 28
Operating capacity
1.059
Bcf/d as posted, timely cycle
Utilization
28%
headroom 72%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.294+0.017
Nov 250.277+0.041
Nov 240.236-0.019
Nov 230.254+0.088
Nov 220.167-0.040
Nov 210.207+0.052
Nov 200.155-0.014
Nov 190.168-0.025
Nov 180.194-0.027
Nov 170.220-0.036
Nov 160.257+0.000
Nov 150.257+0.002
Nov 140.255+0.024
Nov 130.230+0.030
Nov 120.201+0.044
Nov 110.157-0.049
Nov 100.206+0.005
Nov 90.201+0.007
Nov 80.194-0.025
Nov 70.218+0.046
Nov 60.173+0.040
Nov 50.133+0.053
Nov 40.080-0.023
Nov 30.103-0.010
Nov 20.113+0.009
Nov 10.104+0.036
Oct 310.068-0.002
Oct 300.070+0.003
Oct 290.068+0.008
Oct 280.060—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)COL GAS OH OP 07-5

Columbia Gas Transmission (TCO)Placed at the center of Hancock, OH — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COL GAS OH OP 07-5 (Columbia Gas Transmission (TCO) loc 23-5) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/23-5/