SOUTH JERSEY GAS CO

Columbia Gas Transmission (TCO) · Loc 109 · GLOUCESTER, New Jersey
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.102
Bcf/d scheduled
Δ Day-over-day
-0.024
vs Nov 25
7-day average
0.115
Bcf/d
30-day average
0.091
30 of 30 days posted
30-day high
0.138
Nov 24
30-day low
0.038
Oct 29
Operating capacity
0.325
Bcf/d as posted, timely cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.102-0.024
Nov 250.126-0.012
Nov 240.138+0.014
Nov 230.125+0.030
Nov 220.095+0.002
Nov 210.093-0.031
Nov 200.124+0.023
Nov 190.101+0.001
Nov 180.100-0.022
Nov 170.122+0.001
Nov 160.121+0.000
Nov 150.121+0.000
Nov 140.121+0.011
Nov 130.110+0.018
Nov 120.092+0.000
Nov 110.092+0.015
Nov 100.077-0.008
Nov 90.085+0.003
Nov 80.082+0.001
Nov 70.081+0.008
Nov 60.073+0.013
Nov 50.060-0.015
Nov 40.075+0.007
Nov 30.069+0.004
Nov 20.065+0.000
Nov 10.065-0.009
Oct 310.074+0.015
Oct 300.059+0.021
Oct 290.038-0.010
Oct 280.047—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)SOUTH JERSEY GAS CO

Columbia Gas Transmission (TCO)Placed at the center of Gloucester, NJ — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SOUTH JERSEY GAS CO (Columbia Gas Transmission (TCO) loc 109) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/109/