Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

BALTIMORE GAS & ELEC

Columbia Gas Transmission (TCO) · Loc 4 · Howard, Maryland
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.133
Bcf/d scheduled
Δ Day-over-day
+0.004
vs Nov 25
7-day average
0.122
Bcf/d
30-day average
0.108
30 of 30 days posted
30-day high
0.185
Nov 17
30-day low
0.074
Nov 4
Operating capacity
0.818
Bcf/d as posted, timely cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.133+0.004
Nov 250.129-0.011
Nov 240.140+0.030
Nov 230.110+0.003
Nov 220.107+0.001
Nov 210.107-0.020
Nov 200.127-0.003
Nov 190.130-0.021
Nov 180.151-0.034
Nov 170.185+0.044
Nov 160.141+0.001
Nov 150.141+0.000
Nov 140.141+0.025
Nov 130.116+0.014
Nov 120.102-0.002
Nov 110.103+0.019
Nov 100.085-0.005
Nov 90.090+0.001
Nov 80.089+0.000
Nov 70.089+0.004
Nov 60.085+0.010
Nov 50.075+0.001
Nov 40.074-0.002
Nov 30.076-0.013
Nov 20.089+0.000
Nov 10.089+0.003
Oct 310.086+0.002
Oct 300.084-0.005
Oct 290.089+0.001
Oct 280.088—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)BALTIMORE GAS & ELEC

Columbia Gas Transmission (TCO)Placed at the center of Howard, MD — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BALTIMORE GAS & ELEC (Columbia Gas Transmission (TCO) loc 4) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/4/