ELIZABETHTOWN-22

Columbia Gas Transmission (TCO) · Loc 38-22 · NORTHAMPTON, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.015
Bcf/d scheduled
Δ Day-over-day
+0.003
vs Nov 26
7-day average
0.012
Bcf/d
30-day average
0.009
30 of 30 days posted
30-day high
0.015
Nov 25
30-day low
0.005
Nov 9
Operating capacity
0.181
Bcf/d as posted, timely cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.015+0.003
Nov 260.011-0.003
Nov 250.015+0.002
Nov 240.013+0.002
Nov 230.011+0.003
Nov 220.008-0.003
Nov 210.011-0.000
Nov 200.011-0.000
Nov 190.012-0.001
Nov 180.013+0.003
Nov 170.010-0.002
Nov 160.012+0.000
Nov 150.012+0.000
Nov 140.012-0.000
Nov 130.013+0.005
Nov 120.008+0.000
Nov 110.008+0.001
Nov 100.007+0.002
Nov 90.005+0.000
Nov 80.005+0.000
Nov 70.005+0.000
Nov 60.005+0.000
Nov 50.005+0.000
Nov 40.005+0.000
Nov 30.005+0.000
Nov 20.005+0.000
Nov 10.005-0.007
Oct 310.012+0.001
Oct 300.011+0.000
Oct 290.011—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)ELIZABETHTOWN-22

Columbia Gas Transmission (TCO)Placed at the center of Northampton, PA — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ELIZABETHTOWN-22 (Columbia Gas Transmission (TCO) loc 38-22) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/38-22/