Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MOUNTAINEER 3-18

Columbia Gas Transmission (TCO) · Loc 27-18 · West Virginia
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.002
Bcf/d
30-day average
-0.002
30 of 30 days posted
30-day high
-0.002
Nov 16
30-day low
-0.003
Nov 4
Operating capacity
0.036
Bcf/d as posted, timely cycle
Utilization
7%
headroom 93%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.003-0.002-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.002+0.000
Nov 25-0.002+0.000
Nov 24-0.002+0.000
Nov 23-0.002+0.000
Nov 22-0.002+0.000
Nov 21-0.002+0.000
Nov 20-0.002+0.000
Nov 19-0.002+0.000
Nov 18-0.002+0.000
Nov 17-0.002-0.000
Nov 16-0.002+0.000
Nov 15-0.002+0.000
Nov 14-0.002+0.000
Nov 13-0.002+0.000
Nov 12-0.002+0.000
Nov 11-0.002+0.000
Nov 10-0.002+0.000
Nov 9-0.002+0.000
Nov 8-0.002+0.000
Nov 7-0.002+0.000
Nov 6-0.002+0.000
Nov 5-0.002+0.000
Nov 4-0.003-0.000
Nov 3-0.002+0.000
Nov 2-0.002+0.000
Nov 1-0.002+0.000
Oct 31-0.002+0.000
Oct 30-0.002-0.000
Oct 29-0.002+0.000
Oct 28-0.002—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)State only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MOUNTAINEER 3-18 (Columbia Gas Transmission (TCO) loc 27-18) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/27-18/