Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

CGV OP 03-17

Columbia Gas Transmission (TCO) · Loc 26-17 · GREENE, Virginia
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.022
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.022
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.023
Oct 30
30-day low
0.020
Nov 2
Operating capacity
0.115
Bcf/d as posted, timely cycle
Utilization
19%
headroom 81%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.022+0.000
Nov 260.022+0.000
Nov 250.022+0.000
Nov 240.022+0.000
Nov 230.022+0.000
Nov 220.022+0.000
Nov 210.022+0.000
Nov 200.022+0.000
Nov 190.022+0.000
Nov 180.022+0.000
Nov 170.022+0.000
Nov 160.022+0.000
Nov 150.022+0.000
Nov 140.022+0.000
Nov 130.022+0.000
Nov 120.022+0.000
Nov 110.022+0.000
Nov 100.022+0.000
Nov 90.022+0.000
Nov 80.022+0.000
Nov 70.022+0.001
Nov 60.021-0.001
Nov 50.022+0.000
Nov 40.022+0.000
Nov 30.022+0.003
Nov 20.020+0.000
Nov 10.020-0.001
Oct 310.021-0.002
Oct 300.023+0.000
Oct 290.023—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)CGV OP 03-17

Columbia Gas Transmission (TCO)Placed at the center of Greene, VA — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CGV OP 03-17 (Columbia Gas Transmission (TCO) loc 26-17) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/26-17/