COL GAS OH OP 07-3

Columbia Gas Transmission (TCO) · Loc 23-3 · MARION, Ohio
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.026
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.028
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.036
Nov 24
30-day low
0.008
Nov 1
Operating capacity
0.194
Bcf/d as posted, timely cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.026-0.001
Nov 250.027-0.009
Nov 240.036+0.006
Nov 230.030+0.005
Nov 220.025-0.002
Nov 210.027+0.003
Nov 200.024+0.001
Nov 190.023-0.002
Nov 180.025-0.003
Nov 170.028-0.001
Nov 160.029-0.000
Nov 150.029-0.001
Nov 140.030-0.002
Nov 130.032+0.003
Nov 120.029+0.005
Nov 110.024+0.000
Nov 100.024+0.002
Nov 90.022-0.001
Nov 80.023-0.002
Nov 70.025-0.003
Nov 60.028+0.007
Nov 50.021+0.005
Nov 40.016+0.000
Nov 30.016+0.007
Nov 20.009+0.000
Nov 10.008-0.001
Oct 310.010-0.002
Oct 300.012-0.003
Oct 290.015-0.002
Oct 280.017—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)COL GAS OH OP 07-3

Columbia Gas Transmission (TCO)Placed at the center of Marion, OH — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COL GAS OH OP 07-3 (Columbia Gas Transmission (TCO) loc 23-3) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/23-3/