Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

NYSEG OP-02

Columbia Gas Transmission (TCO) · Loc 21 · ROCKLAND, New York
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.011
Bcf/d scheduled
Δ Day-over-day
-0.006
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.019
Oct 31
30-day low
0.002
Nov 4
Operating capacity
0.148
Bcf/d as posted, timely cycle
Utilization
8%
headroom 92%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.011-0.006
Nov 250.017-0.000
Nov 240.018+0.011
Nov 230.007+0.002
Nov 220.005+0.000
Nov 210.004-0.000
Nov 200.005-0.003
Nov 190.008-0.002
Nov 180.010+0.001
Nov 170.009-0.002
Nov 160.011-0.000
Nov 150.011+0.000
Nov 140.011-0.002
Nov 130.013+0.006
Nov 120.007+0.001
Nov 110.005+0.002
Nov 100.003-0.002
Nov 90.005+0.001
Nov 80.005-0.001
Nov 70.005+0.002
Nov 60.003+0.001
Nov 50.002+0.000
Nov 40.002-0.001
Nov 30.003-0.000
Nov 20.003+0.000
Nov 10.003-0.017
Oct 310.019+0.004
Oct 300.015+0.003
Oct 290.011-0.007
Oct 280.018—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)NYSEG OP-02

Columbia Gas Transmission (TCO)Placed at the center of Rockland, NY — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NYSEG OP-02 (Columbia Gas Transmission (TCO) loc 21) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/21/