Gas day Nov 26
0.014
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.010
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.015
Nov 25
30-day low
0.003
Oct 31
Operating capacity
0.024
Bcf/d as posted, timely cycle
Utilization
59%
headroom 41%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.014-0.000
Nov 250.015+0.000
Nov 240.015+0.006
Nov 230.008+0.003
Nov 220.005+0.000
Nov 210.005-0.001
Nov 200.006-0.004
Nov 190.010+0.002
Nov 180.008+0.000
Nov 170.008+0.000
Nov 160.008+0.000
Nov 150.008-0.001
Nov 140.009-0.002
Nov 130.011+0.001
Nov 120.010+0.006
Nov 110.004-0.002
Nov 100.006-0.004
Nov 90.010+0.003
Nov 80.007+0.004
Nov 70.003-0.003
Nov 60.006+0.002
Nov 50.004-0.002
Nov 40.006-0.006
Nov 30.012+0.002
Nov 20.010+0.000
Nov 10.009+0.006
Oct 310.003-0.001
Oct 300.003-0.000
Oct 290.004-0.000
Oct 280.004—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)CENTRAL HUDSON

Columbia Gas Transmission (TCO)Placed at the center of Orange, NY — approximate; the exact meter site is not published.

Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…
Columbia Gas Transmission (TCO) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CENTRAL HUDSON (Columbia Gas Transmission (TCO) loc 11) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tco/11/