Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
0.000
30 of 30 days posted
30-day high
0.000
Nov 26
30-day low
0.000
Nov 25
Operating capacity
0.000
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%
Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.000 | +0.000 |
| Nov 25 | 0.000 | +0.000 |
| Nov 24 | 0.000 | +0.000 |
| Nov 23 | 0.000 | +0.000 |
| Nov 22 | 0.000 | +0.000 |
| Nov 21 | 0.000 | -0.000 |
| Nov 20 | 0.000 | +0.000 |
| Nov 19 | 0.000 | +0.000 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | +0.000 |
| Nov 16 | 0.000 | +0.000 |
| Nov 15 | 0.000 | +0.000 |
| Nov 14 | 0.000 | +0.000 |
| Nov 13 | 0.000 | +0.000 |
| Nov 12 | 0.000 | +0.000 |
| Nov 11 | 0.000 | +0.000 |
| Nov 10 | 0.000 | +0.000 |
| Nov 9 | 0.000 | +0.000 |
| Nov 8 | 0.000 | +0.000 |
| Nov 7 | 0.000 | +0.000 |
| Nov 6 | 0.000 | +0.000 |
| Nov 5 | 0.000 | +0.000 |
| Nov 4 | 0.000 | +0.000 |
| Nov 3 | 0.000 | +0.000 |
| Nov 2 | 0.000 | +0.000 |
| Nov 1 | 0.000 | +0.000 |
| Oct 31 | 0.000 | +0.000 |
| Oct 30 | 0.000 | +0.000 |
| Oct 29 | 0.000 | +0.000 |
| Oct 28 | 0.000 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Chase, NE — approximate; the exact meter site is not published.
Notices
Recent notices on Tallgrass Interstate Gas Transmission (TIGT)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on Tallgrass Interstate Gas Transmission (TIGT)
- BHGD/TIGT WESTERN SUGAR - BOILER 0.011 Bcf/d
- KAAPA RAVENNA/TIGT RAVENNA ETHANOL PLANT 0.008 Bcf/d
- GREEN PLAINS/TIGT WOOD RIVER ETHANOL HAL 0.007 Bcf/d
- CHIEF ET/TIGT ETHANOL PLANT ADAMS 0.006 Bcf/d
- PRA-HORI/TIGT ETHANOL PLANT PHILLIP 0.005 Bcf/d
- NWC/TIGT KAAPA ETHANOL MINDEN PLANT 0.004 Bcf/d
- STERLING/TIGT ETHANOL PLANT LOGAN 0.003 Bcf/d
- YUMA/TIGT ETHANOL PLANT YUMA 0.003 Bcf/d
Cite thisEnercast PipeScrape, TIGT/Black Hills Imperial Beef T2 Chase (Tallgrass Interstate Gas Transmission (TIGT) loc 60389) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/60389/