Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

GREEN PLAINS/TIGT WOOD RIVER ETHANOL HAL

Tallgrass Interstate Gas Transmission (TIGT) · Loc 44142 · Hall, Nebraska
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.007
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.007
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.008
Nov 4
30-day low
0.000
Oct 29
Operating capacity
0.014
Bcf/d as posted, evening cycle
Utilization
47%
headroom 53%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0030.0050.0070.010Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.007+0.001
Nov 250.006+0.000
Nov 240.006-0.002
Nov 230.008+0.000
Nov 220.008+0.000
Nov 210.008+0.002
Nov 200.006-0.001
Nov 190.007+0.001
Nov 180.006+0.000
Nov 170.006+0.000
Nov 160.006+0.000
Nov 150.006+0.000
Nov 140.006+0.002
Nov 130.004-0.001
Nov 120.005+0.000
Nov 110.005-0.002
Nov 100.007+0.001
Nov 90.006+0.000
Nov 80.006+0.000
Nov 70.006+0.002
Nov 60.004-0.004
Nov 50.008-0.000
Nov 40.008+0.000
Nov 30.008+0.000
Nov 20.008+0.000
Nov 10.008+0.005
Oct 310.003+0.000
Oct 300.003+0.003
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
GREEN PLAINS/TIGT WOOD RIVER ETHANOL HAL

Placed at the center of Hall, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GREEN PLAINS/TIGT WOOD RIVER ETHANOL HAL (Tallgrass Interstate Gas Transmission (TIGT) loc 44142) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/44142/