PRA-HORI/TIGT ETHANOL PLANT PHILLIP

Tallgrass Interstate Gas Transmission (TIGT) · Loc 42524 · PHILLIPS, Kansas
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.005
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.005
Bcf/d
30-day average
0.004
30 of 30 days posted
30-day high
0.005
Oct 29
30-day low
0.004
Nov 12
Operating capacity
0.018
Bcf/d as posted, evening cycle
Utilization
25%
headroom 75%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.005+0.000
Nov 250.005+0.000
Nov 240.005+0.000
Nov 230.005+0.000
Nov 220.005+0.000
Nov 210.005+0.000
Nov 200.005+0.000
Nov 190.005+0.000
Nov 180.005+0.000
Nov 170.005+0.000
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005+0.000
Nov 130.005+0.001
Nov 120.004+0.000
Nov 110.004+0.000
Nov 100.004+0.000
Nov 90.004+0.000
Nov 80.004+0.000
Nov 70.004+0.000
Nov 60.004+0.000
Nov 50.004+0.000
Nov 40.004+0.000
Nov 30.004+0.000
Nov 20.004+0.000
Nov 10.004+0.000
Oct 310.004+0.000
Oct 300.004-0.001
Oct 290.005+0.000
Oct 280.005—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
PRA-HORI/TIGT ETHANOL PLANT PHILLIP

Placed at the center of Phillips, KS — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PRA-HORI/TIGT ETHANOL PLANT PHILLIP (Tallgrass Interstate Gas Transmission (TIGT) loc 42524) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/42524/